- Define 3 weather-related ‘use cases’ for analysis and report on the severity and duration of outages and establish the current grid baseline (scenario #1) system performance report (Q2)
- Hold 2 subject matter expert (SME) meetings to review and validate Duke Energy’s Grid Improvement Plan for resiliency scenario #2 and scenario #3 including advancements in micro and mini grid opportunities (Q3 &Q4)
- Synchronize with economic (lost wages) modeling
- Develop matrices including probability distributions, technical and economic consequences
- Generate valuation of resiliency measures and grid resiliency scenario #3
- Conduct 2-3 Stakeholder meetings and develop roadmap (Q3-7)
- Review and validate the list of resiliency advancements in grid scenarios #2 and #3
- Vet final roadmap before publication